Road and canal construction work:
The construction project is located in the southeast of the village of Waren (Müritz). Part of the construction project is the expansion of the existing traffic junction Federower Weg/ Am Kurpark into a roundabout. The number of cables and wires on the construction site must be adjusted. In addition, new construction measures for various supply and disposal media, including brine pipe laying, must be implemented structurally.
Hauptmengen ca.:
Break off pavement: 1,200 m², Break off boards: 1,350 m, Break down gutters: 225 m, Soil removal: 5,600 m³, Break off asphalt: 3,100 m², Cut down trees: 20 pcs., Clear bushes: 550 m², Produce STS material: 3,650 m², FSS-Mat. manufacture: 1,200 m³, ashalt-TS production: 4,050 m², asphalt BS production: 1,000 m², asphalt DS production: 2,350 m², soil supply and installation: 1,375 m³, manufacture boards: 2,050 m, paving: 1,400 m², paving channel production: 440 m, marking: 720 m, signage production: 45 pcs., performance ditch: 1,600 m, pipe delivery and installation: 85 m, pipes AG install 690 m, cable laying 1,800 m, Lighting 8 pieces