This is the acquisition of a sawing and drilling facility for railway rails at the EIV of Moulin Neuf. This installation includes a civil engineering part, a rail conveyor system (starting at the inlet stock, then pre and post machine tool, and ending at the output stock), the machine tool drill saw, and the building with the control operator station
The quantity is 1 installation Drill Saw