The LMBV is planning to operate a permanent arsenic depletion plant. For this purpose, a settling plant is to be built.
- Inlet and separating structure:
+ monolithisches Stahlbetonbauwerk L x B x H = 9.70 m x 3.9 m x 1.5 m.
,
- Chemical cleaning stage:
+ monolithic reinforced concrete basin with cascade to the reaction basin L x W x D = 2.0 x 5.0 x 2.0 m, V = 20 m³, freeboard = 1.2 m
+ monolithic reinforced concrete pool, V = 300 m³ with cascade L x W x D = 17.0 x 5.0 x 3.5 m, freeboard = 1.2 m
,
- Sedimentation:
+ monolithic reinforced concrete basin (settling basin), V = approx. 100 m³, L x W x H = 8.0 x 3.5 x 3.5 m with funnel, freeboard = 1.2 m
,
-Building:
+ single-storey, L x W x H 15.0 x 11.0 x 9.2 m made of lime sandstone with gable roof in classic wood beam and aluminium roofing
,
- Schlammstapelbehälter:
+ Diameter 7.5 m, height approx. 9 m as in-situ concrete structure
,
- Outer layers consisting of:
+ asphalt approx. 2,300 m²
+ Pflasterfläche approx. 130 m²
+ In-situ concrete areas as LAU approx. 70 m²
+ Drainage
+ Retaining wall made of concrete stacking stones approx. 250 pcs
+ Wasserbauarbeiten
+ Street lighting 5 pcs
+ Precast concrete shafts for various types of precast concrete Applications
,
- Earthworks:
+ Excavation incl. disposal approx. 3,000 m³
+ Excavation and re-installation approx. 2,500 m³
,
- Baugrubenverbau:
+ Rückverankerte Trägerbohlwände approx. 1,000 m²
+ Verpressanker ca. 500 m