Electrical wiring and fitting work | Tenderlake

Electrical wiring and fitting work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
29 September 2021
Closing Date:
01 December 2021
Location(s):
DE123 Karlsruhe, Landkreis (DE Germany/DEUTSCHLAND)
Description:
Volkswohnung GmbH, VOB/A EU Open procedure, electrical systems, new construction of nine residential buildings with 152 apartments in Stutensee, residential park Mittendrin, 76297 Stutensee, Sophie-Scholl-Straße 2-30

Electrical systems for the construction of a residential district with 152 apartments totaling around 11,000 m² in Stutensee Blankenloch, on the site of the former swimming pool.

The construction site is divided into 2 sub-areas, each with a separate underground car park.

The apartments are arranged in 9 three-four-storey spatially separated buildings with 15 house entrances.

A café is to be integrated on the ground floor of House VII. Due to the high rated water level, a closed excavation pit with construction and soft gel sole is planned.

The overall completion of all apartments is planned by the first quarter of 2024.

The order specifically covers the power of electrical systems.

Further details are provided in the offer documents.

Electrical Systems Lot 1 - Section A

Electrical systems

The call for proposals is divided into two lots

Bidders can bid in individual lots.

The award can take place in individual lots.

Lot 1 - Section A

Meter cabinets: Part A 9 meter distributor, 1 NSHVT

Housing and multimedia distributors: Part A 99 apartments

NYM clamour line: part A approx. 50,000 m

Cable trays: part A approx. 430 m

Large area sockets: part A approx. 2,200 pieces

Fibre optic cable: part A approx. 4,300 m

Data cable part A approx. 13,800 m

Exact information can be found in the course.

Single terms/intermediate deadlines

Monday, 13.06.2022 - Friday, 10.03.2023 Assembly Unassembled Lot 1 Elektro

Monday, 12/12/2022 - Friday, 08.12.2023 Final assembly Lot 1 Electric

Electrical Systems Lot 2 - Section B

Electrical systems

The call for proposals is divided into two lots

Bidders can bid in individual lots.

The award can take place in individual lots.

Lot 2 - Section B

Meter cabinets: Part B 6 meter distributor

Housing and multimedia distributors: Part B 54 apartments

NYM clamour line: part B approx. 30,000 m

Cable trays: part B approx. 450 m

Large Area Sockets: Part B c. 1,800 pieces

Fibre optic cables: part B on-site

Data cable: part B approx. 7,800 m

Exact information can be found in the course.

Single terms/intermediate deadlines

Monday, 13.03.2023 - Friday, 21.07.2023 Assembly Assembly Lot 2 Elektro

Monday, 03/07/2023 - Friday, 03.11.2023 Final assembly Lot 2 Elektro

Download full details as .pdf
The Buyer:
Volkswohnung GmbH
CPV Code(s):
45311000 - Electrical wiring and fitting work