Description:
Re-tendering of supervisory services in connection with construction contracts for Project Green Gas Lolland-Falster

Green Gas Lolland-Falster includes the establishment of approximately 115 km of steel gas pipeline, of which approximately 45 km of transmission line and 70 km of distribution line. In addition, there are M/R and LV stations. As part of the project, three water crossings will be established over Færge-strømmen, Grønsund and Guldborg Sund, respectively.

This supervisory task includes a subset of the overall project:

• Approx. 45 km transmission line, incl. the fairway crossings at Færgestrøm and Grønsund

• The water crossing at Guldborgs Sund (which is part of the distribution line)

• Establishment of Measurement and regulator station Regulator station in Everdrup and a line valve station in Egesborg

Green Gas Lolland-Falster includes the establishment of approx. 115 km 10" steel gas pipeline, of which approx. 45 km transmission line and 70 km distribution line. In addition, there are M/R and LV stations. As part of the project, three water crossings will be established over Færgestrømmen, Grønsund and Guldborg Sund.

This supervisory task includes a subset of the overall project:

• Approx. 45 km transmission line, incl. the fairway crossings at Færgestrøm and Grønsund

• The water crossing at Guldborgs Sund (which is part of the distribution line)

• Establishment of Measurement and regulator station Regulator station in Everdrup and a line valve station in Egesborg

The land pipeline project for the transmission line includes the preparation of jobs, mulching and preparation of the path for the land pipeline, stringing and burial of the pipeline, as well as subsequent restoration, including the restoration of drains. In addition, a number of crossings of roads, streams, digs, etc. are included. In the course of construction work must also be ensured the maintenance of drainage and drainage of the tracé. As part of the land wiring project, cathodic protection installations with associated engineering cabinets and anode beds are being carried out.

In collaboration with Energinet's supervisory authority, the chosen supplier is responsible for the day-to-day management of the supervision of all activities related to the construction work.

The supplier must participate in the planning of all supervisory activities. The supplier's primary activities will be carried out during the construction phase from December 2022 until all construction activities are completed by mid-2023. The consultant must also ensure that the contractor prepares the necessary documentation as a basis for issuing a permit for the entry into service of the current section of Green Gas Lolland Falster.

For further details regarding the procurement, please refer to the annexes to the tender documents.

Download full details as .pdf
The Buyer:
Energinet GAS TSO A/S
CPV Code(s):
71520000 - Construction supervision services
71521000 - Construction-site supervision services