TWB II is expected to require 1,200 MWh p.a. of electrical energy for its own use for its 32 wind turbines. The
Maximum output is estimated at 2,250 kW.
The supply of electrical energy (green electricity) for the own needs of the offshore wind turbines as well as the park's own substation of the offshore wind farm.