rehabilitation and extension of a school complex at Les Grands Cyprès in Avignon. The consultation covers 21 lots, which are described below. The contract will extend contractually from the date of its notification to the contractor until the end date of the guarantee period of perfect completion (forecast: October 2027): i.e. 43 months. The period for the execution of the services is 31 months from the 1st Service Order to start the work (from the 1st Service Order to start the work (Lot 4 )
Cleaning - Asbestos removal - Lead removalCleaning - Asbestos removal - Lead removal
Exterior joinery -blackoutsExterior joinery -blackouts
Partitions - Linings - False ceilingsPartitions - Linings - False ceilings
Interior joineryInterior joinery
Locksmith metalworkLocksmith metalwork
PaintingPainting
Flexible floor coveringsFlexible floor coverings
Tiles - Wall CoveringsTiles - Wall Coverings
Heating-Ventilation-Air Conditioning- PlumbingHeating-Ventilation-Air Conditioning- Plumbing
Electricity strong and weak currentsElectricity strong and weak currents
Green spacesGreen spaces
Heavy DemolitionHeavy Demolition
Elevating devicesElevating devices
Kitchen equipmentKitchen equipment
Special foundationsSpecial foundations
soil reinforcementsoil reinforcement
General Earthworks - VRDGeneral Earthworks - VRD
Big workBig work
timber frame-timber facades-zinc roofing and cladding-timber claddingtimber frame-timber facades-zinc roofing and cladding-timber cladding
SealingSealing
copecope