Solar photovoltaic modules | Tenderlake

Solar photovoltaic modules

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
01 October 2021
Closing Date:
03 November 2021
Location(s):
PL812 Chełmsko-zamojski (PL Poland/POLSKA)
Description:
Supply and installation of photovoltaic installations, solar collectors and biomass boilers in the area of the Municipality of Dołhobyczów

The subject of the order is the delivery and installation of photovoltaic installations, solar collectors and biomass boilers in the area of the Municipality of Dołhobyczów, which is implemented as part of the project “Renewable Energy Sources in the Municipality of Dołhobyczów”.

Supply and installation of photovoltaic installations in the area of the Municipality of Dołhobyczów

1. Supply and installation of photovoltaic installations in the area of the Municipality of Dołhobyczów, including:

1) supply and assembly based on the technical documentation held by the Contracting Authority of 86 sets of photovoltaic installations,

2) delivery and installation of structures under PV modules,

3) supply and assembly of new PV modules not older than 2020,

4) supply and assembly of new non-2020 DC/AC inverters/ inverters

5) making excavations in the ground to the required depth,

In the event that the photovoltaic panels will be located outside the building where the main switchboard will be located

At a distance of up to 25 meters in a straight line,

6) layout of cable routes, grounding and cables from PV panels to inverter and wires from inverter to electric switchgear

7) installation of switchgear for photovoltaics (DC and AC side) together

With the installation grounding (the ground resistance value should reach <10 Ohm),

8) DC switchgear equipment (surge protector, DC fuse switch)

9) AC switchgear equipment (fuse switch, surge protector, overcurrent switch)

10) performing installation tests and verifying the correct operation of the apparatus,

11) the commissioning of the system and adjustments,

12) measurements of electrical installations required by appropriate regulations,

13) configuration of all inverters, connection to the user's Internet network (in the absence of a fixed Internet connection

At the location of the inverter, the cost of bringing the coverage is covered by the User, in the absence of a web network, the requirement is to equip the User with a module that allows you to connect to the Internet network in the future) and integrate with one system in order to monitoring energy production, ecological benefits and control of the work of photovoltaic installations from the system level. The system must be available for desktop and mobile devices on iOS and Android, system monitoring devices should be able to communicate with a dedicated server on which the intended data will be saved,

14) training facility managers and users from service

And the use of photovoltaic installations carried out in the framework of this proceeding,

15. Documentation of notification of connection of microinstallations to the electricity grid of the regional DSO,

16) manufacture of the necessary mounting holes and culverts for the introduction of equipment,

17) sealing holes and mounting culverts after introduction.

18. Other elements included in Annex No 1.1 to the SWZ and the Draft Agreement constituting Annex No 2.1 to the SWZ.

2. Detailed scope of work (Description of the Order Subject) is contained in Annex No 1.1 to SWZ - Technical documentation of PV installations (Part 1 of the order).

Delivery and installation of solar collectors in the territory of the Municipality of Dołhobyczów

1. Delivery and installation of solar collectors in the territory of the Municipality of Dołhobyczów, including:

1) supply and assembly based on the technical documentation held by the Contracting Authority of 110 sets of solar collectors installations,

2) assembly of solar collectors using systemic assembly sets and connection kits intended for a particular type of collector, the optimal tilt angle of collectors shall be applied, invariant for the collector exposure during the whole year, comprising from 30° to 60° and setting the manifolds as possible in the south direction,

with an acceptable deviation from this direction in the range of -45° to +45°,

3. In order to minimise the risk of damage to collectors during transport to the roof, transport by means of a crane or system ladders with an electric winch should be used,

4) disassembly of the existing c.w.u. heater and disconnect it from the existing installation (the disassembled heater remains

At the disposal of the property owner),

5) installation of a new c.w.u. heater together with a mixing valve

And embedding it into the circulation of the installation c.w.u.,

6) installation and insulation of pipelines between collectors, pumping group,

And the warmer c.w.u.,

7) installation of the pump group,

8) installation of temperature sensors in solar collectors, tank and boiler

9) connection of the existing heat source to the c.w.u. heater,

10) Flushing with solar fluid and carrying out tests of the leakage of the solar plant,

11) filling, venting and properly adjusting the flow of liquid and establishing the correct pressure according to the instructions of the manufacturer of solar collectors,

12) Finish at least according to the original state of the area of the installation transitions (plaster/warming, passages through walls, ceilings, roof) and effective protection against weathering of the sites outside the site where construction works were carried out,

13) Programming and running the automation system,

14) Connect the top tray hose to the second heat source (existing solid fuel boiler) together with the complete pump group, connect it to the solar controller and program its operation in cooperation with the boiler,

15) The Contractor has a duty to train the installation user

In the operation of the devices used. Each device should have an attached Technical—Movement Documentation, an instruction manual written in non-technical language and a general installation scheme.

16. Other elements included in Annex 1.2 to the SWZ and the Draft Agreement, as set out in Annex No 2.2 to the SWZ.

2. Detailed scope of work (Description of the Order Item) is contained in Annex No 1.2 to SWZ - Technical documentation of the installation of solar collectors (Part 2 of the order).

Delivery and installation of biomass boilers in the territory of the Municipality of Dołhobyczów

1. Supply and installation of biomass boilers in the territory of the Municipality of Dołhobyczów, including:

1) supply and assembly based on the technical documentation held by the Contracting Authority of 26 units of biomass boilers,

2) the installation of the suppository to the chimney,

3) Installation of installation security,

4) making the connection of the boiler to the central heating system,

5) making the connection of the boiler to the installation of c. W.,

6) installation of circulating pumps,

7) the installation of the control and control system,

8) performing trials, tests and commissioning of the biomass boiler plant,

9) reconstituting to its original condition any affected surfaces, structural elements and other elements damaged or affected by installation,

10) to train users as to the proper operation of the installed biomass boiler, together with the development of detailed operating instructions and submitting them to users,

11. Other elements included in Annex No 1.3 to the SWZ and the Draft Agreement constituting Annex No 2.3 to the SWZ.

4.3. Detailed scope of work (Description of the Order Subject) is contained in Annex No 1.3 to SWZ - Technical documentation of the installation of biomass boilers (Part 3 of the order).

Download full details as .pdf
The Buyer:
Gmina Dołhobyczów
CPV Code(s):
09100000 - Fuels
09300000 - Electricity, heating, solar and nuclear energy
09331100 - Solar collectors for heat production
09331200 - Solar photovoltaic modules
44621220 - Central-heating boilers
45300000 - Building installation work
45310000 - Electrical installation work
45311200 - Electrical fitting work
45315300 - Electricity supply installations
45317300 - Electrical installation work of electrical distribution apparatus
45330000 - Plumbing and sanitary works
45331110 - Boiler installation work
45332200 - Water plumbing work