1138 - TVX - 14 lots
Works 14 lots for the rehabilitation of building B1 at Jean Moulin high school in Beziers.
Demolition - structural work - insulation - flocking
Cladding removal: 100 m 2 , site fence: 184 ml, demolition floor: 268 m 2 , under renovation: 7 u, masonry opening filler: 11 u, reinforced concrete section: 46 ml, thermal insulation underfloor by flocking: 279 m 2 , thermal insulation at the bottom of the floor with rock wool panels: 1 229 m 2 , double-density composite panel underfloor thermal insulation: 912 m 2 .
Laboratory equipment.
Teachers' mattresses: 18 u, wet student benches: 117 u, dry student mattresses: 36 u, wet mattresses collection: 12 u, dry mattresses collection: 30 u, eye wash showers: 10 u, freestanding sorbet: 10 u, extractor hood: 2.
Electricity - strong currents - weak currents
8,000 m high and low current equipment 2 teaching premises.
Lift devices
Lift 630 kg: 1 set
Landscaping - VRD
Existing coating demolition: 2,350 m 2 , black coated: 589 m 2 , structuring strips: 445 ml, circulating resin: 912 m 2 , tactile band: 136 ml, P2 border: 43 ml, P4 border: 80 ml, swept concrete ramp: 59 m 2 , reinforced concrete benches: 10 ml.
Green spaces.
Topsoil: 276 m 3 , pozzolan: 919 m 2 , shrubs and moss: 919 m 2 ,
Facade cladding - exterior insulation - exterior joinery
Double skin cladding: 1,357 m 2 , metal post: 405 ml, sliding frames: 366 u, English opening: 11 u, fixed frames: 26 u, glazed aluminum doors: 7 u, aluminum sun break: 732 m 2 .
sealing
Sealing on roof terrace: 3 162 m 2 covered deposit: 497 ml bilayer elastomer with rolled grit protection: 3 161 m 2 raised: 534 ml smoke control skylights: 5 u lifeline: 497 ml.
Metalwork - locksmith
Metal doors with 2 leaves: 4 u, grilles ventilation: 6 u, galvanized grating English course: 10 u, handrails: 152 ml railing: 97 ml grating grating in false ceilings: 657 m 2 , metal platform: 2.7 m 2 .
Partitions - doublings - false Ceilings
Partition 98/48 CF 1h: 2 836 m 2 , partition 72/48: 779 m 2 , waterproof sheets: 319 m 2 , hardened plates: 1,949 m 2 , sound insulation: 3,695 m 2 , terracotta tiles: 221 m 2 , doubling in composite panels: 542 m 2 , reinforced hardness doubling: 220 m 2 , Dubbing in Ba13: 836 m 2 , projected plaster coating: 1,506 m 2 , door installation: 264 u, false ceilings not removable: 209 m 2 , false ceilings removable 1200 x 600: 6 248 m 2 , cheeks: 1,562 ml.
Interior joinery
Prepainted full-core doors: 19 u, pre-painted solid-core security doors: 245 u, oculus: 112 u, doors protection: 110 ml, wall protection: 946 ml, chair rails: 1 437 m2, DAS door trim: 66 u, paintings: 43 u, hatches and ducts of visit: 41 u.
Floor coverings - earthenware
Flexible ground screed: 4 703 m 2 , flexible floors: 4,491 m 2 , skirting boards: 2,535 m 2 , screed hard ground: 1 997 m 2 , glued porcelain stoneware 30x30: 1,657 m 2 , anti-slip porcelain stoneware: 259 m 2 , porcelain stoneware baseboards: 1 230 ml, porcelain stoneware baseboards: 307 ml, glazed porcelain stoneware: 1,121 m 2 , spec: 846 m 2 .
Painting
Acrylic paint walls: 6,348 m 2 , acrylic painting ceilings: 684 m 2 , vinyl painting walls: 1,320 m 2 , vinyl paint ceilings: 310 m 2 , pliolite: 366 m 2 , anti-dust floor paint: 316 m 2 painting, metallic works; 1 466 ml, painting on wood: 1 214 m 2 .
Heating - GTC - mechanical ventilation - plumbing - sanitary
Steel radiators: 191 u, room regulation: 89 u, ECM cabinet: 7 u, DF central unit: 11 u, fresh air compensation: 12 u, electric water heater: 19 u, suspended WC: 34 u, lava -hands: 11 u, washbasins trough: 30 u, urinals: 15 u, shower panels: 16 u, weir wall: 6 u, sink on furniture: 4 u, fire extinguishers: 39 u.