Creating the flat roof waterproofing, creating the extensive green roof including irrigation and sidewalks, work railings and escape route railings, as well as corresponding built-in parts.
- approx. 2,400 m
- approx. 1,410 m
- approx. 560 m
- approx. 150 m
- approx. 265 m
- approx. 85 m
- approx. 79 m safety guardrail,
- approx. 200 m railing along the escape route,
- 5 flat roof anchorage devices according to DIN EN 795, rail system, approx. 220 m rail length,
- approx. 170 m drainage and facade channels,
- approx. 30 parapet gullies as emergency storage,
- approx. 25 m downpipe,
- approx. 21 RWA roof light domes,
- approx. 450 m parapet cover, aluminum,
- approx. 95 m aluminum roof edge profile,
- approx. 110 m fenders,
- approx. 2 pieces of roof hoods elevator shaft ventilation,
- approx. 270 m