- the construction of a new road with a length of around 675 m, connecting the roundabout to the entrance to the town of Lorentzweiler on the N7, at CR122 towards Hunsdorf, bypassing the sports facilities;
- the construction of a mixed track (pedestrians / cyclists) connecting the roundabout on the N7 to the PC15;
- the construction of a crossing structure for the railway by underpass, with a length of approximately 18 m, and two access hoppers of lengths 160 m and 60 m;
- the connection of the PC15 cycle path, along the railway, to sports facilities and to CR122 towards Hunsdorf, passing over the structure.
- the construction of a new road with a length of around 675 m, connecting the roundabout to the entrance to the town of Lorentzweiler on the N7, at CR122 towards Hunsdorf, bypassing the sports facilities;
- the construction of a mixed track (pedestrians / cyclists) connecting the roundabout on the N7 to the PC15;
- the construction of a crossing structure for the railway by underpass, with a length of approximately 18 m, and two access hoppers of lengths 160 m and 60 m;
- the connection of the PC15 cycle path, along the railway, to sports facilities and to CR122 towards Hunsdorf, passing over the structure.