Metalworking (windows, facade, doors) for the construction of a student dormitory with 297 housing units in 2 buildings.
Metalworking (windows, facade, doors) for the construction of a student dormitory with 297 housing units in 2 buildings.
In detail:
Planning, prefabrication, delivery and installation of:
- approx. 36 pcs. Window or façade elements as aluminum-glass construction with triple glazing, in different field sizes from approx. 3.0 to approx. 20.0 sqm size and with different pitches, partly with doors and / or skylights, partly with crash-proof glazing.
Incl. Door equipment with locks, partly with motor drive.
- 2 pieces of sun protection systems as lamellar construction
As well as all necessary additional services such as sealing connection with loose fixed flange construction.
- 20 pieces of fire-resistant glazing EI 30 / F 30 inside in different field sizes from approx. 3.0 to approx. 15 sqm in size, partly with T 30 RS doors and partly with crash-proof glazing.
The installation must take place in two stages, as the installation of some door leaves takes about 5-6 months with a time delay.
Plus the necessary planning services and all necessary documents and approvals.