In the course of the planned dismantling of Bürgerspital Solothurn Spitalhäuser 2, 3 and 4 from the 70 years including access ramp and chimney, the dismantling will take place in two stages. Dismantling stage 1 (above ground) incl. pollutant remediation will be realized in 2022/2023 and dismantling stage 2 (underground) will then take place in 2023 / 2024. In the following, services for dismantling stage 2 (underground) are advertised. The services include the dismantling of remaining basements (ground floor to 2.UG) from houses 2, 3 and 4 including repair measures for the so-called media tunnel in the 3.UG. The dismantling volume (underground) is approx. 16,000 m3. Subsequently, the dismantling perimeter is filled with earth material in layers and compacted.
In the course of the planned dismantling of Bürgerspital Solothurn Spitalhäuser 2, 3 and 4 from the 70 years including access ramp and chimney, the dismantling will take place in two stages. Dismantling stage 1 (above ground) incl. pollutant remediation will be realized in 2022/2023 and dismantling stage 2 (underground) will then take place in 2023 / 2024. In the following, services for dismantling stage 2 (underground) are advertised. The services include the dismantling of remaining basements (ground floor to 2.UG) from houses 2, 3 and 4 including repair measures for the so-called media tunnel in the 3.UG. The dismantling volume (underground) is approx. 16,000 m3. Subsequently, the dismantling perimeter is filled with earth material in layers and compacted.