The existing building is being completely renovated. The new community hall is arranged on the upper floor over two floors.
The library is installed on the ground floor and the basement. The outer walls of the building on the eaves and gable are up to the ceiling
Wear from the 1st floor.
The best. The roof truss and the wooden beam ceilings on the 2nd floor, 1st floor and ground floor are completely removed.
A new reinforced concrete ceiling is drawn in parts via the wall, ground floor and upper floor. The outer walls are covered by ground floor reinforced concrete columns from the ground floor.
Stiffened to the roof.
A new building is being built in the building. On the east side there are rooms for music clubs. In the north are toilet facilities and shooting ranges with
Adjoining rooms arranged.
All ventilation and heating technology is installed in the west.
EG: In the north-west, rooms are planned for the adult education centre. Access is via the south side with an information entrance hall.
An information hall is planned in the south-east. Upper floor: Side rooms, changing rooms and cloakrooms are planned for the hall on the north side.
Core quantities:
— approx. 200 m
— approx. 125 m
— ca 148 m stair step tiles,
— approx. 930 m
— approx. 580 m plinth tiles.