The three-winged building complex of the Fichtenberg Oberschule (FOS) consists of
from an east wing, a west wing and a north wing, which are over
a spacious hall (central building) are connected to each other.
The planned construction project includes the building of the Fichtenberg Oberschule
with the exception of the auditorium, the area of mid-level staff 3rd floor and DG and the
Outer shell of the east wing.
The advertised services include the construction phase north wing:
-Renovation of the wooden roof truss according to wood protection report and static proof. All rafters are renewed after static detection and sliding as well as purlins according to existing conditions, containers are renovated.
-Static upgrading of the ceiling beams above the 2nd floor by reinforcements made of wood and interceptions from steel profiles and formation of a ceiling pane by means of OSB panel according to static proof.