B10 old, L1214 new, dismantling between Eislingen and Süßen
Bodenbewegung 4.100 m3
Leitungsgräben 1.500 m3
Asphalt milling 57,700 m2
Asphalt pavement 10,150 m3
Frostschutzschichten 7.200 m3
Ballast base courses roadway (d = 15 cm) 20,400 m2
Gravel base courses, footpaths and cycle paths (d = 30 cm) 18,540 m2
Asphalttragschicht AC 32 TS (Bk 10 + Bk 32) 20.300 m2
Asphaltbinderschicht AC 16 B S SG (Bk 10 + Bk 32) 20.300 m2
Asphaltbinderschicht AC 16 B S SG (Ausgleichsschichten) 850 to
Asphaltdeckschicht AC 11 D SP (Bk 10 + Bk 32) 30.300 m2
Asphalt base course AC 22 T L (footpaths and cycle paths) 17,000 m2
Asphalt surface course AC 8 D L (footpaths and cycle paths) 17,000 m2
Setting curbs (HB, RB, TB) 4,400 m
Setting curbs (FB, Busbord) 950 m
Setting curbs (barrier-free crossing aids) 440 m
Reconstruction of 8 bus stops (handicapped accessible) with crossing aids
Rehabilitation of 2 buildings
New construction of 3 roundabouts