Construction of the outdoor facilities of a student dormitory after new construction as well as reorganization of the outdoor facilities of the existing student dormitory on the same property. Execution in two construction phases adapted to the construction progress of the building construction project.
Quantities:
- 1150m2 Asphalt
- 800m2 in-situ concrete
- 1000m2 concrete and granite paving
- 1000m enclosures (steel, granite curb)
- 75m precast concrete elements (blocks)
- 150m drainage channels
Equipment elements:
- Bicycle leaning bracket, bicycle handlebar holder, double-decker parking for bicycles
- Waste containers, benches
- Slide, swing, sandpit, workout station, table tennis, badminton
- 3500m2 lawn and meadow sowing
- 600m2 shrub and hedge planting
- 42 tree plantings
Construction of the outdoor facilities of a student dormitory after new construction as well as reorganization of the outdoor facilities of the existing student dormitory on the same property. Execution in two construction phases adapted to the construction progress of the building construction project.
Quantities:
- 1150m2 Asphalt
- 800m2 in-situ concrete
- 1000m2 concrete and granite paving
- 1000m enclosures (steel, granite curb)
- 75m precast concrete elements (blocks)
- 150m drainage channels
Equipment elements:
- Bicycle leaning bracket, bicycle handlebar holder, double-decker parking for bicycles
- Waste containers, benches
- Slide, swing, sandpit, workout station, table tennis, badminton
- 3500m2 lawn and meadow sowing
- 600m2 shrub and hedge planting
- 42 tree plantings