Shell construction (masonry, concrete, plaster and screed work)
Construction site equipment - Manufacture, maintenance and dismantling of dust and noise protection as well as safety measures.
Masonry, concrete, plaster and screed work in the existing building in different sub-areas on 4 floors of a clinic and laboratory building during operation.
Protection of surfaces and equipment, film protection walls, soundproofing construction site partitions / access locks, construction site / zipper doors, safety railings and covers of breakthroughs
Individual foundations, StB wall as fire wall, making ceiling and wall openings, closing ceiling openings, core drilling walls and ceilings (StB, MW),
MW interior and shaft walls, making and closing wall openings, checking and completing walls
Renewing and repairing interior plaster on partial surfaces, closing slots and defects
Add screed in partial surfaces, on separating layer, quick-drying, fill defects / slots.