- new construction of a two-storey daycare center with 3+5 groups
- wood/concrete hybrid construction
- heating, cold and hot water and ventilation pipes
- 4 usage units
- heating pipelines, approx. 400 m
- drinking water pipelines, approx. 900 m
- sewage pipelines, approx. 400 m
- ventilation pipes, approx. 700 m² or 300 m
- fire bulkhead for wall/ceiling openings
- Aluminium laminated insulation, diffusion-proof, PVC or sheet metal sheath