Vivantes Klinikum Neukölln
Rudower street 48
12351 Berlin
New construction Nordkopf H50.
Construction of a new extension house 50 with direct connection to the existing building 30 with structural interventions in the existing buildings as well
- helicopter landing place on the roof up to approx. +25 m height,
- New construction on a slope with a low slope OKG from +36.45 m to approx. +37.80 m above sea level NN,
- OKFF level 00 + 40.95 m, level 01 emergency reception on a slope with entrance -4.50 m or +36.45 m (starting heights for trough excavation pit).
Building characteristics:
- length of the building: 80 m (in extension of the existing building, house 30),
- width of the building: 78 m (in width of the gable house 30),
- Base area of the new building: ... m
- Medical usage level: Level 01 to Level 04 (6 full floors),
- full basement up to +31.95 m approx. 4.00 m below OKG,
- Building height (without helicopter landing pad and technical centers) approx. 22.00 m over +/- 0.00 m,
- Height helicopter landing place approx. 25.00 m over +/- 0.00 m or approx. 28.00 m above OKG,
- Total height of the building, in particular technical centers and rooms for flight crew approx. +30,20 m above sea level or +34,00 m above ground,
Total gross floor area: 40 500 m
- BRI total: 185 000 m
- sole thickness: reinforced concrete, WU d = 1.35 m (with underpasses etc.),
- trough pit over the entire basement area,
- Three-sided, extensive diaphragm walls with a mean length of 10.50 m and a depth of up to 13.50 m,
- gable side of the excavation = gable of the existing building of house 30 as underpinning with approx. 700 m
- Full-surface sealing sole of approx. 1.00 m thickness with anchoring at a depth of approx. -15.00 m below +/- 0.00 m and approx. 11.50 m below OKG.
Overburden through stock floor, sealing sole and diaphragm walls anchored according to statics.
Earthworks: excavation limited by diaphragm walls and HDI underpinning, excavation up to approx. 7.50 m below ground, earth masses approx. 40,000 m Remaining water from the trough construction pit as well as dewatering of the underpinning and lowering in the existing building UG Haus 30 - HGW +34.40 m and 3.50 m under OKG. Reinforced concrete construction of the shell: - Reinforced concrete base Thickness: 1.35 m in WU with sealing connections with full-surface sealing foils. Reinforced concrete construction of the structure: - supports, external walls, stiffening cores and supports for the heliport heliport, - Concrete masses estimated: 33 000 m Helipad: - Size of the landing area: 28x28 m with circulating rainwater and fishing facilities, - supporting structure: steel structure including all entrances and exits as well as maintenance bridges, - Function of the heliport: Fully functional in accordance with interfaces for installation of the building within the roof-mounted technology centers or at a defined location. The time for commissioning the helipad is detached from the shell and is defined in time as the building is completed, - Performance description: Functional with extended work and assembly planning by the contractor. Construction site equipment in connection with the remaining work of the shell.