At the future transition between town and landscape, an ensemble of regional school, elementary school with after-school care center and two-field sports hall with cafeteria is being built on an area of around 7 hectares with the "New SchoolCampus" Zarrentin. The three polygonal structures are arranged around a central campus square. Access to the campus is from the south.
The two-storey buildings are planned to be made of reinforced concrete with a light brick facade. The roofs are flat pitched and extensively green. The two school buildings have a courtyard. The individual schools are assigned quiet, manageable outdoor areas for games and breaks. The two schools have a spacious two-storey foyer with an open staircase. There are two staircases and a lift for further access. The administration and some specialist classes are located on the ground floor of the regional school. There are specialist classes and general classrooms on the upper floor. The teacher's room and primary school classes are located on the ground floor of the primary school with nursery. The hoarding area is also located here. The general classrooms are located on the upper floor. All classrooms are naturally ventilated. The hallways are spacious and offer space for free learning zones. The two-field sports hall is used for school sports as well as by clubs. The hall can be divided into two parts in the middle by a dividing curtain. The OKFF of the sports hall is 1m lower than the rest of the building. The hall has an all-round baffle wall up to 2 m high on three sides. On the fourth page is thegrandstand. Two equipment rooms are attached to the sports hall. There is a changing area with 2 women's and 2 men's changing rooms. The technical supply for all three buildings is located on the upper floor of the two-field sports hall with canteen. The canteen is used by both schools and has 152 seats. The canteen kitchen is planned as an output and regeneration kitchen. The development of the campus area was the first step.Construction of the regional school began in December last year. Construction of the two-field sports hall with canteen will start in spring 2021 and for primary school/school in summer 2021. The overall completion of the school campus is scheduled for early 2023.
12 m PVC-U DA110 protection tubes for low voltage and lighting cables, 45 lighting poles up to 6.00 m HP including foundation, 4 x small field LP 12.00 m floodlight towers including foundation