- General Steinhoff barracks,
- renovation of existing buildings KdoLw - building complex 4,
- Painting and coating work H4_KKE 3501.
- 10 pieces assembly, dismantling, implementation and provision of mobile armor,
- 35 m
- 5,000 m
- 860 m
- 13,000 m
- 3 500 m
- 1 700 m
- 9,000 m
- 3 400 m
- 675 m
- 2 260 m first and repeat coating of floor surfaces with EP lacquer,
- 185 m coating of wooden handrail,
- 1 900 m coating steel tube 50 mm,
- 170 m
- 240 m
- 12 pcs. First sheet steel doors W / H up to 1 200/2 500 mm,
- 12 pcs first coating steel frame doors W / H up to 3 730/3 500 mm,
- 8 pcs overhaul coating steel frame doors W / H up to 3 000/3 500 mm,
- 35 m overhaul coating of steel stairs (steel stringer + step),
- 3,000 m sealing connection joints.
Period:
05/2020 to 12/2020
The painting work is carried out on a storey-by-storey basis.