Third-party testing in the context of the construction of the surface sealing system of landfill sections 3.1 and 3.2 of the old landfill 3
The materials required for the installation of the surface sealing and their installation in accordance with the applicable
monitor the quality management plan and control the results of the self-audit, with the aim of
- provided materials
- Installation and installation plans
- the sample fields produced, and
- the surface seal produced in the construction field
to issue the appropriate release recommendations to the approval authority.
The quality management plan must be updated during the construction project; the 1st update must be carried out at the latest after evaluation of the sample fields.