Electricity supplies | Tenderlake

Electricity supplies

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
19 September 2023
Closing Date:
19 October 2023
Location(s):
DE80J Mecklenburgische Seenplatte (DE Germany/DEUTSCHLAND)
Description:
Supply of green electricity

The object is the supply of electricity with green electricity to the electricity consumption points of the

different clients:

Neubrandenburger Wohnungsgesellschaft mbH, Heidenstraße 6, 17033

Neubrandenburg Immobilien Reparatur- und Servicegesellschaft mbH

Neubrandenburg, Bertolt-Brecht-Str. 1c, 17034 Neubrandenburg;

Sozial- und Jugendzentrum Hinterste Mühle gGmbH, Hinterste Mühle 2, 17033

Neubrandenburg;

Veranstaltungszentrum Neubrandenburg GmbH, Parkstraße 1, 17033

Neubrandenburg;

Nursing home Neubrandenburg gGmbH, Ameisenweg 19, 17036 Neubrandenburg;

Delivery in the standard load profile takes place at approx. 876 acceptance points,

whose expected annual electricity demand is approx. 2.9 GWh. Sleeps 6

Acceptance points, the delivery is carried out in registering performance measurement

with an expected annual electricity demand of approx. 1.5 GWh. The

specific points of acceptance are listed in the specifications for the individual

Company listed. The total delivery volume is approx. 4.3 million kWh/year.

The specifications for the individual points of acceptance in the bill of quantities

annual consumption and performance data are from 2022. These

Data merely provides an orientation framework for the quotation calculation

and do not constitute binding purchase quantities.

The charging stations and a multi-storey car park are to be supplied with green electricity that comes from renewable energies within the meaning of Section 3 No. 21 of the Renewable Energy Sources Act (EEG) and is not subsidised under the EEG. It can be supplied either via a corresponding electricity supply contract, for which guarantees of origin are cancelled by the electricity supplier at the Federal Environment Agency, or with electricity from self-generation on site (e.g. electricity from photovoltaic systems). The specifications already list the charging stations that will be installed in 2023.

Delivery Günstrom

1. The object is the supply of electricity from green electricity to the electricity consumption points of the

different clients:

Neubrandenburger Wohnungsgesellschaft mbH, Heidenstraße 6, 17033

Neubrandenburg Immobilien Reparatur- und Servicegesellschaft mbH

Neubrandenburg, Bertolt-Brecht-Str. 1c, 17034 Neubrandenburg;

Sozial- und Jugendzentrum Hinterste Mühle gGmbH, Hinterste Mühle 2, 17033

Neubrandenburg;

Veranstaltungszentrum Neubrandenburg GmbH, Parkstraße 1, 17033

Neubrandenburg;

Nursing home Neubrandenburg gGmbH, Ameisenweg 19, 17036 Neubrandenburg;

Delivery in the standard load profile takes place at approx. 876 acceptance points,

whose expected annual electricity demand is approx. 2.9 GWh. Sleeps 6

Acceptance points, the delivery is carried out in registering performance measurement

with an expected annual electricity demand of approx. 1.5 GWh. The

specific points of acceptance are listed in the specifications for the individual

Company listed. The total delivery volume is approx. 4.3 million kWh/year.

The specifications for the individual points of acceptance in the bill of quantities

annual consumption and performance data are from 2022. These

Data merely provides an orientation framework for the quotation calculation

and do not constitute binding purchase quantities.

The charging stations and a multi-storey car park are to be supplied with green electricity that comes from renewable energies within the meaning of Section 3 No. 21 of the Renewable Energy Sources Act (EEG) and is not subsidised under the EEG. It can be supplied either via a corresponding electricity supply contract, for which guarantees of origin are cancelled by the electricity supplier at the Federal Environment Agency, or with electricity from self-generation on site (e.g. electricity from photovoltaic systems). The specifications already list the charging stations that will be installed in 2023.

2. Electricity delivery prices:

The customer pays an electricity price in cents per kilowatt hour for the energy consumed.

The electricity delivery price does not include:

- Levy in accordance with the Renewable Energy Sources Act (EEG levy);

- electricity tax;

-Sales tax;

As well as fees charged by the respective network operator:

- network usage fees of the network operator;

- Fees for measurement and provision of counting data by the network operator or metering point operator;

- Levy according to § 19 paragraph 2 of the Electricity Network Fee Ordinance (StromNEV);

- Offshore liability levy in accordance with Section 17f of the Energy Industry Act (EnWG);

- Surcharges in accordance with the Combined Heat and Power Act (KWKG);

- Concession fees in accordance with the Concession Fee Ordinance (KAV);

- any reactive work that may occur (above the payroll exemption limit);

An adjustment of the electricity supply prices during the term of the contract is excluded. During the entire duration of the

In the electricity supply contract, a fixed price applies to the supply of electricity.

3. Network usage:

The supply of electricity, including grid use, is put out to tender and awarded (so-called all-inclusive electricity supply contract).

The individual acceptance points are located in the grid area of Neubrandenburger Stadtwerke GmbH.

4. Conclusion of contract:

As a result, a contract with the same prices is to be concluded for each of the contracting authorities involved.

A special document is drawn up for the electricity supply contract in the form of the attached model electricity supply contract.

The bidder's own contractual terms and conditions may not be used as a basis for the offer.

An electronic auction will be held

Additional information on the electronic auction:

The tenders must first be submitted in full to the client. After sending the respective placement to

the bidders and the notification of the auction period, the auction takes place. There will be 1 auction date for one hour

happen. This will be on 15.11.2023.

Delivery of green electricity charging stations

1. The object is the supply of electricity from green electricity to the electricity consumption points of the

different clients:

Neubrandenburger Wohnungsgesellschaft mbH, Heidenstraße 6, 17033

Neubrandenburg Immobilien Reparatur- und Servicegesellschaft mbH

Neubrandenburg, Bertolt-Brecht-Str. 1c, 17034 Neubrandenburg;

Sozial- und Jugendzentrum Hinterste Mühle gGmbH, Hinterste Mühle 2, 17033

Neubrandenburg;

Veranstaltungszentrum Neubrandenburg GmbH, Parkstraße 1, 17033

Neubrandenburg;

Nursing home Neubrandenburg gGmbH, Ameisenweg 19, 17036 Neubrandenburg;

Delivery in the standard load profile takes place at approx. 876 acceptance points,

whose expected annual electricity demand is approx. 2.9 GWh. Sleeps 6

Acceptance points, the delivery is carried out in registering performance measurement

with an expected annual electricity demand of approx. 1.5 GWh. The

specific points of acceptance are listed in the specifications for the individual

Company listed. The total delivery volume is approx. 4.3 million kWh/year.

The specifications for the individual points of acceptance in the bill of quantities

annual consumption and performance data are from 2022. These

Data merely provides an orientation framework for the quotation calculation

and do not constitute binding purchase quantities.

The charging stations and a multi-storey car park are to be supplied with green electricity that comes from renewable energies within the meaning of Section 3 No. 21 of the Renewable Energy Sources Act (EEG) and is not subsidised under the EEG. It can be supplied either via a corresponding electricity supply contract, for which guarantees of origin are cancelled by the electricity supplier at the Federal Environment Agency, or with electricity from self-generation on site (e.g. electricity from photovoltaic systems). The specifications already list the charging stations that will be installed in 2023.

2. Electricity delivery prices:

The customer pays an electricity price in cents per kilowatt hour for the energy consumed.

The electricity delivery price does not include:

- Levy in accordance with the Renewable Energy Sources Act (EEG levy);

- electricity tax;

-Sales tax;

As well as fees charged by the respective network operator:

- network usage fees of the network operator;

- Fees for measurement and provision of counting data by the network operator or metering point operator;

- Levy according to § 19 paragraph 2 of the Electricity Network Fee Ordinance (StromNEV);

- Offshore liability levy in accordance with Section 17f of the Energy Industry Act (EnWG);

- Surcharges in accordance with the Combined Heat and Power Act (KWKG);

- Concession fees in accordance with the Concession Fee Ordinance (KAV);

- any reactive work that may occur (above the payroll exemption limit);

An adjustment of the electricity supply prices during the term of the contract is excluded. During the entire duration of the

In the electricity supply contract, a fixed price applies to the supply of electricity.

3. Network usage:

The supply of electricity, including grid use, is put out to tender and awarded (so-called all-inclusive electricity supply contract).

The individual acceptance points are located in the grid area of Neubrandenburger Stadtwerke GmbH.

4. Conclusion of contract:

As a result, a contract with the same prices is to be concluded for each of the contracting authorities involved.

A special document is drawn up for the electricity supply contract in the form of the attached model electricity supply contract.

The bidder's own contractual terms and conditions may not be used as a basis for the offer.

An electronic auction will be held

Additional information on the electronic auction:

The tenders must first be submitted in full to the client. After sending the respective placement to

the bidders and the notification of the auction period, the auction takes place. There will be 1 auction date for one hour

happen. This will be on 15.11.2023.

Download full details as .pdf
The Buyer:
Neubrandenburger Wohnungsgesellschaft mbH
CPV Code(s):
31682000 - Electricity supplies