Design, delivery and installation of the Central Dynamic Passenger Information System equipment on the railway line No. 157 on the section Bieniowiec – Skoczów.
The subject of the contract includes:
Basic scope: Design, delivery and installation of CSDIP elements together with technical infrastructure at the Pierściec and Skoczów stations and at the Chybie Mnich, Zaborze and Skoczów Bajerki passenger stops and at technologically related facilities in the scope of the subject of the contract:
1) Preparation of design documentation necessary for the proper performance of all deliveries and commissioning of the infrastructure, including the performance of the required construction works and obtaining for it all the required opinions, arrangements, admissions, conditions, decisions and permits necessary to implement the subject of the contract;
2) Execution of all works, including works in accordance with the scope of the contract on the basis of the design documentation developed by the Contractor and approved by the Contracting Authority, referred to in point 1), and all preparatory works necessary to perform the scope of the Agreement and all activities required by law;
3) Delivery, installation and commissioning of executive elements of the Central Dynamic Passenger Information System (CSDIP) and SSC in accordance with Ipi-6;
4) Delivery, installation and commissioning of the teletransmission access network together with the accompanying infrastructure in accordance with Ie-122 and Ie-108;
5) Delivery, installation of devices and cabling in the field of power supply of systems implemented in the task;
6) Inclusion of facilities located along railway line No. 157 to the existing Z-XOTKtsd fiber optic network on the Bielsko – Biała Skoczów section in order to implement access to the IP-MPLS network.
optional range:
Design and construction of a fiber optic network on the Chybie – podg Bieniowiec route to radio facilities located along the railway line in order to implement access to the IP-MPLS network, by developing documentation necessary for the proper performance of works and commissioning of infrastructure, including the performance of the required construction works and obtaining for them all the required opinions, arrangements, admissions, conditions, decisions and permits necessary to implement the subject of the contract.