Extension Kreisklinik Altötting - additional care 207.2-1120-01 Scaffolding
Extension of the Kreisklinik Altötting - increase care.
- about 6 000 m 2 Facade scaffolding as working and protective scaffolding in subsections and subareas, conversion of the entire scaffolding into 2 construction phases, including roof scaffolding, bridging, interior railing, scaffolding widening, stair climbing, protective measures,
- approx. 1 psch construction hoist for persons and material, 400 kg, H = 17 m,
- About 100 m 2 Weather protection roof in sections,
- about 800 m 3 Interior scaffolding in 8 staircases on the top floor, staggered and dismantled.