1. The subject of the contract is the supply of accommodation equipment:
• Wardrobe (WP2-34), in the amount of 660 pcs.;
• Soldier's bedside cabinet - metal, in the amount of 560 pcs.;
• Storage rack - metal, in the amount of 165 pcs.;
• Standing hanger - metal, in the amount of 260 pcs.;
• Common room table, in the amount of 450 pcs.;
• Gun rack, in the amount of 155 pcs.;
• Barracks stool on a metal base WP2-30, in the amount of 1,000 pcs.;
The subject matter of the order is described in Annex 2 to SWZ.
2. Place of the contract: Białystok, Suwałki, Olsztyn, Lidzbark Warmiński, Lipowiec, Giżycko, Gołdap, Węgorzewo, Orzysz, Elbląg, Braniewo, Bartoszyce, Morąg.
3. The Contractor shall guarantee the goods delivered for a period of: minimum 24 — maximum 36 months from the date of delivery.
4. Required deadline for the performance of the contract with obtaining a material effect: 70 days from the date of signing the contract.
1. The subject of the contract is the supply of accommodation equipment:
• Wardrobe (WP2-34), in the amount of 660 pcs.;
• Soldier's bedside cabinet - metal, in the amount of 560 pcs.;
• Storage rack - metal, in the amount of 165 pcs.;
• Standing hanger - metal, in the amount of 260 pcs.;
• Common room table, in the amount of 450 pcs.;
• Gun rack, in the amount of 155 pcs.;
• Barracks stool on a metal base WP2-30, in the amount of 1,000 pcs.;
The subject matter of the order is described in Annex 2 to SWZ.
2nd Place of execution of the object of the order
• 25 WOG Białystok - SOI in Bialystok, 70 Kawaleryjska Street;
• 25 WOG Białystok - SOI in Suwałki, 12 Wojska Polskiego Street;
• 22 WOG Olsztyn – SOI in Olsztyn, 2 Dąbrowskiego Street;
• 22 WOG Olsztyn – SOI in Lidzbark Warmiński, Przystaniowa 1;
• 22 WOG Olsztyn – Security Group in Lipowiec, Lipowiec 138;
• 24 WOG Giżycko, SOI in Giżycko, 1 Maja 11 Street;
• 24 WOG Giżycko, SOI in Gołdap, 29 Partyzantów Street;
• 24 WOG Giżycko, SOI in Węgorzewo, Gen. J. Bema 16;
• 24 WOG Giżycko, SOI in Orzysz, 27 Partyzantów Street;
• 21 WOG Elbląg, SOI in Elbląg, 15 Kwiatkowskiego Street;
• 21 WOG Elbląg, SOI in Braniewo, 63 Stefczyka Street;
• 21 WOG Elbląg, SOI in Bartoszyce, Al. Wojska Polskiego 4;
• 21 WOG Elbląg, SOI in Morąg, Al. Wojska Polskiego 16;
• Regional Infrastructure Board in Olsztyn, Saperska 1.
3. The Contractor shall provide a guarantee for the delivered products for the period: minimum 24 – maximum 36 months from the date of delivery;
4. Required deadline for the performance of the contract with obtaining a material effect: 70 days from the date of signing the contract.