Maintenance of lift equipment at Enea Elektrownia Połaniec S.A. for a period of 12 months
1.1 Basic scope for flat-rate work:
1.1.1 Maintenance of equipment — inspections, maintenance, defects of lever equipment: cranes, cranes, hoists, power plants, winches, cranes, wagon winch, traverse
1.1.2 Standing on duty to remove failures in lever equipment in the shift system.
1.1.3 Maintaining documentation of devices subject to UDT and TDT and preparation of lift equipment for reception and participation in UDT and TDT receipts.
1.1.4 Operation of the SAP system in the scope of: safe organization of work while maintaining the lifting equipment.
1.1 Scope for post-built works:
1.2.1 Conduct post-built work in the field, plan repairs, removal of breakdowns beyond the lump sum range, cranes, cranes, hoists, power plants, winches, cranes, wagon winches, demaging beams, travers and undertracks.
1.2.2 Installation and handling of (own) modular hanging scaffolding.
1.2.3 Installation and operation of a hanging electrical scaffold owned by the Orderman. This scaffolding is dedicated to the K-9 boiler /Green Blok/.