Modernization and extension works to the third lane in the Florence-Pistoia section, from km 9 + 850 to km 27 + 390. Lot 2, located on the A11 Firenze-Pisa Nord motorway.
Modernization and extension works to the third lane in the Florence-Pistoia section, from km 9 + 850 to km 27 + 390. Lot 2, located on the A11 Firenze-Pisa Nord motorway.
Contract code 0040 / A11 - job 0G105 - CIG 7949825320 - CUP H84E07000210005
Main category: OG3 - EUR 139 818 366.08.
Other separable categories:
- OG1 - EUR 2 119 560.08,
- OG10 - EUR 2 085 000.50,
- OG12 - EUR 1 057 548.79,
- OS3 - EUR 1 884 287.11,
- OS10 - EUR 6 974 194.16,
- OS11 - EUR 1 895 393.41,
- OS12A - EUR 28 509 684.54,
- OS18A - EUR 12 141 574.79,
- OS21 - EUR 39 539 762.31,
- OS28 - EUR 517 984.82,
- OS34 - 11 700 245.59 EUR.