Renovation and partial new construction of the Marktplatz 9 estate in 95349 Thurnau (former Gräf bakery) as additional rooms for the castle hotel and component 1
1 x 100 kW gas condensing boiler including buffer cylinder and central fresh water station
1 small distribution board with 3 heating circuits
1 St pressure maintenance
500 m low-alloy stainless steel pipe (DN12 — DN35) including insulation
350 m² of underfloor heating in the staple gun system
250 m² of underfloor heating in the dry construction system
18 tube radiators including built-in thermostatic valve
18 bathroom radiators including piping with low-alloy stainless steel pipe
1 psch fire protection measures on pipelines and their component feedthroughs
1 psch core drilling, pressure tests, inventory documentation