Electrical works - Construction of future-oriented open youth facilities and administrative centres (3.1-2EU-23)
- approx. 8 distributors (electrical installation)
- Energiemanagementsystem
- Approx. 3 EDP free-standing distributors with passive components
- ca. 200m Kabelbühnen, Steigetrassen,
- ca. 125m Unterflurkanäle
- approx. 50 pcs floor boxes
- approx. 200m main and supply lines
- ca. 30.000m Installationskabel
- Approx. 12,000 m of computer cabling
- approx. 100m fiber optic cabling
- approx. 400 EDP data sockets
- Home alarm system with approx. 140 warning tone generators and approx. 3,000m cable
- Adaptation/upgrading of existing cable ducts (plastic)
- Lighting system with approx. 500 luminaires
- Outdoor lighting with approx. 60 pole, floor recessed and bollard luminaires
- Emergency lighting with approx. 18 individual battery lights
- SMI components for sun shading control
- fire protection measures
- Breakthroughs, core drilling
- Documentation, as-built documents