Maintenance contracts are put out to tender for:
- HVAC systems,
— central control technology,
— heating and plumbing,
- electrotechnical systems,
— interior doors – façade,
- fire extinguishing systems.
For the SVLFG office building in Stuttgart, Vogelrainstraße 25.
HVAC systemsMaintenance supply/exhaust air system 31 680 m3/h.
Central control technologyMaintenance of BMS and I&C systems.
Heating - PlumbingMaintenance of 2 gas boilers 400 KW, 2 gas boilers 450 KW, 1 cooling system 750 KW.
Electrical systemsMaintenance of 21 distribution systems, 361 fire detectors, approx. 709 Instabus units.
Interior doors - façadeMaintenance of approx. 330 sun protection systems, approx. 400 doors, approx. 330 windows.
Firefighting equipmentMaintenance of approx. 30 SHEVs, approx. 1,000 sprinkler nozzles, 25 wall hydrants, approx. 80 hand extinguishers.