Road construction
Topsoil work | 14,600 m³
Earthwork | 54,350 m³
Produce soil consolidation | 9,900 m²
Supply and install filter gravel for drainage trench | 2,600 m³
seepage pipe DN 150 - DN 200 | 2,320 m
Plastic piping DN 150 - DN 350 | 147 m
Reinforced concrete pipeline DN 300 - DN 1000 | 66 m
Making road drains | 6 pcs.
Making manholes (including settling and seepage shafts) | 134 pcs.
Make pump shaft DN 3000 | 1 pc.
Make a frost protection layer | 19,150 m³
Milling asphalt (up to 4 - 20 cm) | 14,000 m²
Asphalt work | 26.860 m²
Paving lines/curbs | 960 m
Sole and bank protection made of heavy gravel and hydraulic blocks | 2.360 to