The contract includes delivery, construction and commissioning of a new hydraulic system, including pipe system, mainly for operating larger bending and tensioning rigs. Existing rigs will be moved from the current location at the Marine Technology Centre in Trondheim to Torgardsvegen 12 (K-Lab floor 1). In addition, various small-scale test rigs are also to be moved and connected (K-Lab floor 1). The actual relocation of the rigs is part of another contract, while this contract includes technical supply and connections.
The contract includes delivery, construction and commissioning of a new hydraulic system, including pipe system, mainly for operating larger bending and tensioning rigs. Existing rigs will be moved from the current location at the Marine Technology Centre in Trondheim to Torgardsvegen 12 (K-Lab floor 1). In addition, various small-scale test rigs are also to be moved and connected (K-Lab floor 1). The actual relocation of the rigs is part of another contract, while this contract includes technical supply and connections.