The installation of a reception depot for hydraulic sand transport, the construction of two area access roads, the construction of a canopy of a pressure pipe, the construction of two large culverts and primary barriers in a main waterway at a turbo roundabout (to be realized in this work), the realization of two temporary traffic diversions.
a. performing clean-up work;
b. cleaning and dampening waterways
c. performing earthworks and arranging depots for hydraulic sand transport;
d. applying asphalt pavements;
e. applying drainage and divers;
f. realizing hydraulic engineering works in main waterways;
g. the construction of temporary diversions;
h. building an enclosure to protect main underground infrastructure.