The city of Neuburg an der Donau is building 2 buildings with a total of 27 apartments including underground parking as part of the subsidized housing construction.
- approx. 155 m
- approx. 650 m
- approx. 625 m
- approx. 170 m eaves slabs;
- approx. 110 m
- approx. 40 m
- approx. 150 m
- approx. 50 m
- approx. 30 m
- approx. 550 m of edging (concrete borders; aluminum strips, plastic strips);
- approx. 260 m
- Planting and sowing work including completion maintenance and subsequent 2-year development maintenance;
- 23 pieces of bicycle stand;
- 80 pcs of facade channels;
- 20 pcs of drainage channels class B or D;
- 170 m cable trench with empty conduit laying.
Technical equipment:
- 380 m sewer pipe PP DN 100-150;
- 8 pc inspection shafts made of concrete;
- 1 pc inlet shaft for pre-cleaning;
- 355 m
- 123 pcs of boxes for packing trenches;
- 690 m