The existing building is being completely renovated. The new community hall is arranged on the upper floor over two floors.
The library will be installed on the ground floor and basement.
The best roof truss as well as the wooden beam ceilings above the 2nd floor, 1st floor and ground floor will be completely expanded. A new reinforced concrete floor will be installed over the basement, ground floor and upper floor in some areas. The outer walls are reinforced with reinforced concrete columns from ground floor to roof. There is a new building in the basement. Rooms for music associations are being created on the east side. Toilet facilities and shooting ranges with adjoining rooms are arranged in the north. In the West, the entire ventilation and heating technology is installed. EC: In the north-west, rooms are planned for the adult education center. Access is via the south side with information entrance hall.
An information hall is planned in the south-east. Upper floor: On the north side, auxiliary rooms, changing rooms and cloakrooms are planned for the hall
Core quantities:
- 250 stackable row seating, steel frame with wooden shell upholstered with armrests;
- 150 stackable row seating, steel frame with wooden shell upholstered without armrests;
- 2 pcs chair trolleys;
- 86 four-legged folding tables, round steel tubes, table top with HPL laminate;
- 4 table transport trolleys;