Specialist planning Ventilation systems for the construction of a children's hospital in the city center in Frankfurt am Main with connection to the Bürgerhospital across the street (tunnel, bridge) and conversion of the existing building as well as relocation to the building, subsidized construction, approx. 9,725 gross floor area and 4,274 m
Technical planning technical equipment according to § 53 HOAI for equipment group 3 ventilation systems, phases 1-5 for new construction a children's hospital with roof garden and with the exclusion of the citizen hospital on the other side through a tunnel and a bridge. as well as reconstruction of the Bestansdgebäudes and relocation. about 14 135 m