The Project, approved by Resolution of May 26, 2023, of the General Directorate of Rural Development, Innovation and Agrifood Training of the Ministry of Agriculture, Fisheries and Food, includes the execution of the following works:-Current intake in Monegros Canal from which the water will be derived to the M-47 ditch and, from this, to the pond of foot of channel of new execution.-Pond of foot of channel, BP2, with approximate volume of 388,000 m3 and with NAMO height 382.50 masl, from which the irrigation network of Floor 2 is supplied by gravity, for an area of 860.12 ha.-Intermediate pond, BP1, with an approximate volume of 91,500 m3 and with NAMO elevation 344.00 meters above sea level, from which the irrigation network Floor 1 is supplied by gravity, which includes the San Juan Network dominated by the existing San Juan reservoir that is supplied from the BP1 pond, for an area of 1246.48 ha.-Connection pipe between pond at the foot of the channel (BP2) and intermediate pond (BP1) for turbine intake.-Elevated raft, BP3, with an approximate volume of 93,000 m3 and with a NAMO elevation of 418.00 meters above sea level, from which it supplies the area not dominated by natural pressure, that is, around 666.66 ha, which will be structured on two floors, floor 3 and floor 4. From this pond, the dominated area in which the available pressures allow sprinkler irrigation will be supplied through a load intake in the impulsion-distribution pipe. This area will be called floor 3. -Repumping with conventional electricity input for the dominated area in which the pressures are insufficient for sprinkler irrigation, this network will be called floor 4.-Expected power, 44 kW, supplied from the conventional electricity network.-Turbine-Pump system with mechanical coupling, located next to BP1 pond, to raise all the water on floors 3 and 4 taking advantage of the available energy due to the unevenness between the BP2 ponds and BP1, and the flow to be derived to the BP1 pond, water consumed by the irrigation network of Floor 1. Turbine efficiency considered, 90% (limiting some turbine installers). The total installed power will be 274 kW (2x137) for the pump to be coupled to the pump turbine, and 295 kW (2x148) for the turbine.-Impulsion-distribution pipe to BP3 and, to irrigation network of floor 3 and repumping to floor 4.-Irrigation networks.-Tertiary network (up to plot), which will have a length of about 8.76 km.-Telecontrol.-Electrical installations in low.-Medium voltage electrical installations.
The Project, approved by Resolution of May 26, 2023, of the General Directorate of Rural Development, Innovation and Agrifood Training of the Ministry of Agriculture, Fisheries and Food, includes the execution of the following works:-Current intake in Monegros Canal from which the water will be derived to the M-47 ditch and, from this, to the pond of foot of channel of new execution.-Pond of foot of channel, BP2, with approximate volume of 388,000 m3 and with NAMO height 382.50 masl, from which the irrigation network of Floor 2 is supplied by gravity, for an area of 860.12 ha.-Intermediate pond, BP1, with an approximate volume of 91,500 m3 and with NAMO elevation 344.00 meters above sea level, from which the irrigation network Floor 1 is supplied by gravity, which includes the San Juan Network dominated by the existing San Juan reservoir that is supplied from the BP1 pond, for an area of 1246.48 ha.-Connection pipe between pond at the foot of the channel (BP2) and intermediate pond (BP1) for turbine intake.-Elevated raft, BP3, with an approximate volume of 93,000 m3 and with a NAMO elevation of 418.00 meters above sea level, from which it supplies the area not dominated by natural pressure, that is, around 666.66 ha, which will be structured on two floors, floor 3 and floor 4. From this pond, the dominated area in which the available pressures allow sprinkler irrigation will be supplied through a load intake in the impulsion-distribution pipe. This area will be called floor 3. -Repumping with conventional electricity input for the dominated area in which the pressures are insufficient for sprinkler irrigation, this network will be called floor 4.-Expected power, 44 kW, supplied from the conventional electricity network.-Turbine-Pump system with mechanical coupling, located next to BP1 pond, to raise all the water on floors 3 and 4 taking advantage of the available energy due to the unevenness between the BP2 ponds and BP1, and the flow to be derived to the BP1 pond, water consumed by the irrigation network of Floor 1. Turbine efficiency considered, 90% (limiting some turbine installers). The total installed power will be 274 kW (2x137) for the pump to be coupled to the pump turbine, and 295 kW (2x148) for the turbine.-Impulsion-distribution pipe to BP3 and, to irrigation network of floor 3 and repumping to floor 4.-Irrigation networks.-Tertiary network (up to plot), which will have a length of about 8.76 km.-Telecontrol.-Electrical installations in low.-Medium voltage electrical installations.