In preparation for the construction of the new 8-storey building, demolition work is required in parts of the existing building. In order to be able to carry out the partial demolition, interceptions must be made in the inventory. The tendered services include the demolition of the extension to the ward block west north of axis 4' except for a small ceiling area. Furthermore, a part of the interim CNA will be completely discontinued. After the temporary support of the ceilings to be preserved has been established, the building can be demolished floor by floor.
Partial demolition of massive parts of buildings as complete demolition including gutting and renovation
as well as preparation of the excavation pit with shoring work, in separate sections.
-ca. 2600m3 Erdhaushub,
of which approx. 500m
approx. 240m2 Trägerbohlenwand, rückverankert,
Keep 1 piece of scaffolding tower with stair tower and construction hoist,
Gutting and renovation of approx. 460m
after gutting approx. 1000m
ca. 40m
Dismantling of building services installations