The following is to be installed / installed:
1 medium-voltage system with transformer
1 Low voltage main distribution
1 Main building distribution
15 Unterverteiler
approx. 120,000 m of high- and low-voltage power lines
approx. 1,700 m Kabelrinne
Approx. 1,100 installation devices such as switches and sockets, presence detectors
KNX bus with approx. 65 subscribers
approx. 850 lighting fixtures indoors, 290 lighting fixtures outdoors
Emergency lighting system with approx. 400 escape route plates and luminaire
8 data distributors, approx. 250 network connections, fiber optic cabling
7 video cameras for indoor and outdoor use
Clock system with master clock and 9 slave clocks
The city of Memmingen, Stadtwerke Memmingen, is planning to build a new combined indoor and outdoor swimming pool as a year-round swimming pool.
The new building is to be built on the site of the existing outdoor swimming pool, after demolition of the existing building. The new combined pool includes a 25-meter swimming pool with 8 lanes, a diving board 1 meter / 3 meters, a teaching pool with approx. 12.5 x 10 meters, a course pool with movable floor, a
Toddler pool, as well as other attractions. In the area of the outdoor pool, a 50-meter pool with 6 lanes, a non-swimmer pool with approx. 500 m² with various attractions and a toddler pool with approx. 100 m² are being built. In addition, in addition to a beach volleyball court, a playground and
like, an outbuilding with changing rooms, sanitary facilities and a kiosk was built.
For a detailed description of the electrical installation, see the service description.
Scheduled schedule:
Work will begin within 12 working days of receipt of the request, which is expected to be received by week 42/2023.
The service must be completed (ready for acceptance) within 770 working days after the above-mentioned deadline for the start of execution.