Interior doors 1st BA
Brief description of the measure:
On the site of IGS Lindenfeld, a 3-storey extension for a primary school is to be built next to the existing main building. The construction project will be carried out in 2 construction phases. The service described here concerns the 1st construction phase.
Further descriptions: see bill of quantities
Execution times:
Technical clarification, sample: within 4 weeks after placing the order
Sides: 29.01. - 16.02.2024
Door leaves: 06.05. - 17.05.2024
Main positions
Wooden block frames with smooth wooden door leaf, various dimensions 42 pcs,
Wooden stick frames with wooden frame door leaf, various dimensions 9 pcs,
Wooden block frames with smooth HPL door leaf, various dimensions 8 pcs,
Steel frames with sheet steel doors, different dimensions, 6 pcs