Innenputzarbeiten
- construction site equipment,
- sample areas - 3 pieces,
- documentation of construction products,
- Clean and check the surface - approx. 3,600 m
- Spraying, fully covering / masonry - approx. 1 715 m
- adhesive contact / grooving / concrete - approx. 1 737 m
- Lime-cement plaster, 2-layer walls (painting) - approx. 2,497 m
- Lime cement plaster, 1-layer walls (tiles) - approx. 955 m
- Lime cement plaster, 2-layer supports (painting) - approx. 121 m
- Lime cement plaster, 2-layer concrete beam beams (painting) - approx. 85 m
- Lime cement plaster, heated benches / stands 1-ply (tiles) - approx. 125 m
- Window reveals - approx. 172 m
- Lime cement plaster walls / stairwell - approx. 103 m
- Lime cement plaster ceiling with pre-treatments - approx. 10 m
- plaster reinforcement - approx. 250 m
- plaster connections with joint sealing tape profile - approx. 680 m,
- cleaning corner strips / plastic - approx. 1 100 m,
- plaster end profile / plastic - approx. 200 m,
- Clean wall openings later / with a time delay - approx. 30 m
- Protective measures for windows / doors - approx. 1,000 m
- protective measures ground - approx. 2,000 m,
- protective measures ceiling - approx. 2 000 m.