U2, U-Bhf. Rosa-Luxemburg-Platz/barrier-free expansion (2nd part) and major overhaul

barrier-free expansion (2nd part) and basic repair

The Rosa-Luxemburg-Platz U-Bahn station is part of Line 2 of the Berliner Verkehrsbetriebe.

Designed by architect Alfred Grenander, the Rosa-Luxemburg-Platz U-Bahn station was built in 1913. It is located on the eastern part of the U2 line, between Alexanderplatz and Senefelder Platz stations. The station runs from north to south below Rosa-Luxemburg-Straße. It was built using the cut-and-cover method as an "under-pavement station" at a simple depth and is connected to the street level at the head ends by two fixed staircases.

The northern exit is located at the intersection of Rosa-Luxemburg-Straße and Torstraße. From the staircases, vestibules lead to the central platform, which is 4.5 m below the grounds. Between the two exits, the platform slab, including the vestibule areas, is 147 m long and has a maximum width of 7.6 m in the middle of the platform. The Rosa-Luxemburg-Platz subway station is a listed building in the Berlin list of monuments, which is located in the city area in a "monument area ensemble". The building, which is now over 100 years old, has suffered a great deal of damage.

Therefore, the basic repair of the station is to be carried out as part of this construction project. In part 1 of the barrier-free extension, an elevator has already been installed. In part 2 of the barrier-free expansion (bA), the guidance system for the blind is to be built as part of this construction project. Furthermore, Part 2 of the bA includes the demolition and disposal of the mastic asphalt as well as the installation of the new mastic asphalt on the platform slab.

A construction period of approx. 48 months is planned for the measure.

13 Concrete works

BST plate, precast beams C25/30, XC3,

W0, b/h=12/20 cm 483.0 m

Semi-prefabricated platform slab,

b/d= 14/5.5 cm, C30/37, XC3, XD1, W0 866.0 m²

In-situ concrete platform slab, d = 9.5 cm,

C30/37, XC3, XD1, 105,5 m³

Track aisle pavement slabs, A1, I 90 462.0 m

17 Stahlbauarbeiten

Cutting end., installation HEA 300 fuse main girder 82.0 m

Cutting end., installation HEB 240 safety main girder 215.0 m

Cutting end., Installation of safety cross beam HEB 160 57.6 m

23 Plastering and stucco work

Plaster support stainless steel, ribbed expanded metal, ceilings 1129.0 m

Flachkappen-Deckenputz, GP, CS II, d=20 mm, Q3 gefilzt 293,0 m²

Cap ceiling plaster, GP, CS II, d=20 mm, Q3 felted 2178.0 m²

Kappenspiegel i. M. 100/36 cm (Stich), GP, CSII, Q3, geflzt 294,0 St

Plaster mat stainless steel, anchoring 1758.0 m²

Lime-cement gauge plaster, reinforced, d = approx. 3 cm 1758.0 m²

24 Tile and slab work

Light wall tiles rear track walls 980.0 m²

Light wall tiles Stair walls, end wall 320.0 m²

Dark wall tiles, sloping plinths 363.0 m²

35 Korrosionsschutzarbeiten

Corrosion protection of the lower girder flanges, C3 2781.0 m

Corrosion protection double-T, U-profile truss walls 120.0 m

Corrosion protection of the platform supports, C3 28.0 pcs

Corrosion protection lower flange ceiling longitudinal beam, C3 120.0 m

81 Concrete maintenance work

Dry blasting, concrete soffits, ceiling soffits 3521.0 m²

Capping., reprofiling of local

Excavation sites depth up to 10 cm 770.0 pcs

Kappende., EP - Rissinjektion, Klebepacker, w>=0,3 mm 892,0 m

Cutting end., Existing double T-beam partially free-lifting 270.0 m

Cutting end., reinforced, partially freeing existing bulb beams 30.0 pcs

Hintergleiswä. and plinth, dry blasting 1875.0 m²

Hintergleiswä., EP-Rissinjektion, w>=0,3 mm; Klebepacker 350,0 m

Base, PUR crack injection, w>=0.3 mm; drill packer 117.0m

84 Demolition works

Slabs, lower girder flange free, concrete 2781.0 m

Demolition of tile wall, mortar bed, d = approx. 3 cm 1343.0 m²

Dismantling of insulation containing KMF 3.5 m3

Ceiling, remove lime-cement plaster, d= approx. 2 cm 2316,0 m²

Abbr.Bahnsteigpl. StB-Hohldielen, C 25/30, d= ca. 9 cm 835.0 m²

Dismantling double T-beam 120 445.0 m

Dismantling double T-beam 140 455.0 m

Demolition of support pillars, walls, KS-MW 142.0 m3

87 Entsorgungsleistungen

ASN 120117, abrasive waste not contaminated 170.0 t

ASN 170101, concrete not contaminated 430.0 t

ASN 170101, mixtures of concrete, bricks, tiles,

Ceramic, uncontaminated 78.0 t

ASN 120116*, Strahlmittelabfälle kontaminiert 85,0 t

ASN 150202* Suction and filter material, hazardous 1.0 t

02 Barrier-free expansion part 2

26 Gussasphaltarbeiten

Gußasphaltestrich AS-IC15-30 827,3 m²

84 Demolition and dismantling works

Demolition mastic asphalt, thickness up to 5 cm, PAH<100 mg/kg 1054.0 m²

87 Entsorgungsleistungen

ASN 170301*, Straßenaufbruch (PAK > 100 mg/ kg) 145,0 t

The bill of quantities includes the following trades/services:

00 General services,

01 Overhead costs, BE and construction management personnel

02 Technical processing

03 Surveying

04 Floor vestibule south, subsoil investigations, expert opinions

01 Grundinstandsetzung

01 scaffolding work

12 masonry work,

13 concrete work,

14 natural stone work,

17 Stahlbauarbeiten,

18 waterproofing work,

23 plastering work,

24 tile and slab work,

25 screed work,

27 carpentry work,

31 steel and metal work,

32 Verglasungsarbeiten,

34 painting and varnishing works,

35 corrosion protection work,

36 flooring works,

39 drywall works,

81 Betonerhaltungsarbeiten,

84 demolition and demolition work,

87 disposal services,

02 Barrier-free expansion part 2

24 Tile and slab work BLS,

26 mastic asphalt works,

31 Metallbauarbeiten PP,

84 demolition and demolition work,

87 disposal services,

Download full details as .pdf
The Buyer:
Berliner Verkehrsbetriebe, Bereich Einkauf/ Materialwirtschaft
CPV Code(s):
45221000 - Construction work for bridges and tunnels, shafts and subways