This procurement procedure concerns the award of a contract regarding design, delivery, installation and commissioning of flue gas condensation plant retrofitted to the existing Line 3. The procurement procedure is carried out as a negotiated procedure with prior call for competition according to section 47 of the Utility Directive (2014/25/EU). See section 5.2 in Part 0.B Tender Conditions for additional information about how negotiations will be conducted. The Contracting Authority reserve the right to sign a contract based on the initial offer.
This procurement concerns the Works regarding design, delivery, installation and commissioning of a new flue gas condensation system with the purpose of producing energy from waste, to be distributed as district heating via the existing district heating distribution network.
The Works comprise, cf. Part III, Appendix A1 Design Basis:
• A new flue gas condensation system with heat pump
• All necessary heat exchangers and pumps
• A new ID-fan
• A water treatment plant for condensate cleaning
• Chemical dosing systems with tanks
• New or upgraded stack
• All district heating installations and connection to the district heating system
• All CMS equipment and implementation of the Works shall be fully implemented in the existing CMS
• All necessary electrical equipment including connection to the overall electrical system
• All necessary auxiliary equipment, tanks etc
• All necessary design, manufacturing, supply, erection, testing, commissioning and hand-over
• Documentation and preparation of data into the Clients O&M system