Road works, sewer construction and construction of 3 light signalling systems.
Road works, sewerage and construction of 3 light-signalling systems
— pick up approx. 1 000 m
— approx. 2 700 m
— pick up approx. 1 410 m
— pick up approx. 270 m
— take up approx. 2 020 m
— take up approx. 1 700 m
— produce approximately 1 000 m of hollow with seepage line,
— install approx. 13 500 m
— produce approximately 1 500 tonnes of antifreeze layer 0/45 (cycling/pavement and ancillary surfaces),
— produce approximately 5 400 tonnes of antifreeze layer 0/45 (road surface),
— produce approximately 320 tonnes of an asphalt base layer of AC 22 TN (cycling/pavement),
— prepare approximately 1 660 m
— approx. 2 680 tonnes of asphalt base layer of AC 22 T S (roadway),
— approx. 1 625 tonnes of grit mastic asphalt binder layer of AC 16 SMA BS (roadway),
— approximately 11 375 m
— reset approx. 50 sewer shafts,
— produce approx. 1 320 m concrete pipeline DN 300 to DN 600 with a ditch,
— set up approx. 900 m portable protective wall,
— produce a protective structure for approx. 400 m,
— approx. 100 m
— approx. 14 pcs. masts and foundation for signpost. signage,
— manufacture approx. 3 control cabinets for LSA,
— supply and set up approx. 23 light signal masts with foundation,
— install approx. 41 junction boxes,
— produce approximately 1 000 m of cable conduits and cable trenches.