Extension of the operating theatre and LHK
Zentralklinikum Suhl
Lot 9: Building automation
The SRH Zentralklinikum Suhl currently operates nine operating rooms in the central operating theatre. Adjacent on the same level are a left heart catheter measuring station and an angiography device. Left heart catheter and angiography device must be replaced promptly. In the central operating room, the eye surgeries are currently also being carried out,
which, however, is ineffective due to long lock times. The number of eye surgeries is
currently so high that it is planned to build two separate eye operating theatres.
According to the current projection of the SRH, about 20% of these could still be used by gyn surgeries. Furthermore, it is planned to set up a second left heart catheter measuring station. In order to achieve these goals, it is planned to use the available expansion area "old OR" for use as a cardiology department with two
Prepare left heart catheter measuring stations and angiography equipment. After the cardiology area has been cleared, the area would be converted into a self-sufficient area for the expansion of the operating room.