The turnkey realization of a 4-speed secondary school including a school sports hall as a two-field hall is planned.
The construction project also includes the associated outdoor facilities as well as the furnishing / equipment of the school and sports hall.
Delivery and installation at school:
- Delivery and installation of approx. 165 closed built-in wardrobes including the upper panels up to the ceiling,
- Shelving systems made of wood approx. 43 pieces,
- School tables width from 60 cm to 130 cm approx. 450 pieces,
- desks and roll containers approx. 1 040 pieces, cross-chairs and chairs approx. 200 pieces,
- Lounge furniture about 20 pieces and special furniture as a sitting cuboid. about 30 pieces,
- card stand, card holder, table and chair transport wading, stretcher,
- Equipment of the caretaker room with workbench and shelf system,
- Pool table and foosball table.