New construction of the Schwäbisch Hall correctional facility
Sewage systems
- 37 toilets, 44 washbasins, 5 barrier-free toilets, 8 showers
- Connection of approx. 100 prefabricated wet cells supplied by the customer
- Connections to a distribution kitchen and 6 ward kitchens
- Approx. 126 mounting elements for Duofix
- Approx. 7000m stainless steel pipe and approx. 2000m plastic composite pipe (+ insulation)
- House connection DN100 with shut-off valve, filter and connection set for water meter
- Ca. 500 Absperrarmaturen
- 5 Zirkulationspumpen
- Ca. 100 Strömungsteiler
- 13 Hygienespülungen
- 3 Kleinhebeanlagen
- Fire extinguishing system as a wet system with 96m3/h to supply the outdoor hydrants
- Cistern pump with accessories for garden irrigation
- 2 air compressors with approx. 20 connection points and 300m piping
- Approx. 2500m of rainwater and dirty water pipes in SML and partly. Silent PP
- Dry risers with approx. 200m stainless steel pipe, 4 surface-mounted cabinets and 17 built-in cabinets for removal
- Main drainage for a roof area of approx. 4500m2 and 2200m2, connection to approx. 60 roof gullies,
- Approx. 2000m wick seam pipe for the piping of the individual room vents in the prefabricated wet rooms
- Construction water supply for the finishing trades