Objects of the order are the expansion of Morgowa Street on the section from the property 90 to Cienistej Street with a length of 110 m, roadway width 6 m, construction of a one-sided walkway with a width of 2 m, construction of a junction with Cienista Street, construction of lighting, drainage of road, reconstruction of colliding infrastructure technical.
The order will be implemented on the basis of:
Decision on authorisation for the implementation of road investment No 12/2019 of 20 May 2019 mark: AR.6740.63.10.2019.LL63 maintained by decision mark: I-III.7821.10.2019 of 16 September 2019
The Contractor shall include in the offer material benefits resulting from the acquisition of demolition materials.
A detailed description of the subject of the contract is specified in:
1 design documentation, Technical specifications for the performance and reception of construction works;
2. the proposed provisions of the public procurement contract together with the annexes.